Afficher la notice abrégée

dc.contributor.authorNieri, Ilaria
dc.contributor.authorPagliara, Stefano
dc.contributor.authorPALERMO, MICHELE
dc.date.accessioned2025-03-08T11:05:11Z
dc.date.available2025-03-08T11:05:11Z
dc.date.issued2023
dc.date.submitted2023-05-01T13:42:51Z
dc.identifierONIX_20230501_9788855185141_169
dc.identifier2704-579X
dc.identifierhttps://library.oapen.org/handle/20.500.12657/62753
dc.identifier.urihttps://doab-dev.siscern.org/handle/20.500.12854/196200
dc.description.abstractAmong his hydraulic designs, Leonardo planned the construction of an artificial lake in an area east of the castle of Vinci, his native village. The project, a surprising demonstration of his perfect knowledge of places where he lived, is illustrated in three drawings found and studied by Renzo Cianchi. Today, it is particularly interesting to analyze the feasibility of Leonardo’s project, by chronologically translating it to the 21st century, namely in 2020. Based on an accurate hydrologic analysis, this paper aims at providing further insights on Leonardo’s study, focusing on the feasibility of the dam.
dc.languageItalian
dc.relation.ispartofseriesTerritori
dc.rightsopen access
dc.subject.otherLake of San Lorenzo
dc.subject.otherLake of Vinci
dc.subject.otherSerravalle lake
dc.subject.otherLeonardo da Vinci Lake
dc.subject.otherLeonardo da Vinci
dc.subject.otherthema EDItEUR::N History and Archaeology::NH History
dc.titleChapter Leonardo da Vinci e il lago di Serravalle
dc.typechapter
oapen.identifier.doi10.36253/978-88-5518-514-1.19
oapen.relation.isPublishedBy2ec4474d-93b1-4cfa-b313-9c6019b51b1a
oapen.relation.isbn9788855185141
oapen.pages8
oapen.place.publicationFlorence
dc.seriesnumber36
dc.abstractotherlanguageAmong his hydraulic designs, Leonardo planned the construction of an artificial lake in an area east of the castle of Vinci, his native village. The project, a surprising demonstration of his perfect knowledge of places where he lived, is illustrated in three drawings found and studied by Renzo Cianchi. Today, it is particularly interesting to analyze the feasibility of Leonardo’s project, by chronologically translating it to the 21st century, namely in 2020. Based on an accurate hydrologic analysis, this paper aims at providing further insights on Leonardo’s study, focusing on the feasibility of the dam.


Fichier(s) constituant ce document

FichiersTailleFormatVue

Il n'y a pas de fichiers associés à ce document.

Ce document figure dans la(les) collection(s) suivante(s)

Afficher la notice abrégée