Logo DOAB
  • Publisher login
    • Support
    • Language 
      • English
      • français
    • Deposit
            View Item 
            •   DOAB Home
            • View Item
            •   DOAB Home
            • View Item
            JavaScript is disabled for your browser. Some features of this site may not work without it.

            Chapter A Blockchain-Based Secure Submission Management Framework for Design and Construction Phases

            Thumbnail
            Author(s)
            Das, Moumita
            Tao, Xingyu
            Xu, Yuqing
            Cheng, Jack C. P.
            Language
            English
            Show full item record
            Abstract
            AEC projects generate numerous versions of BIM models during the design and construction phases. This process is complicated by the sheer number of domains in large projects and the interlinkage of BIM deliverables (for example the structural BIM model follows the corresponding architectural BIM model). However, due to the generation of multiple versions and parallel design progress in different domains (especially in large projects), multi-domain delivery teams often fail to access and comply with the latest/required/approved design requirements during the progression of the design phase and complete issue addressing during the construction phase, which creates confusion, may lead to disputes. Moreover, due to the contractual nature of the parties involved data and process security is also very important. Therefore, this research presents blockchain-based secure coordination workflows for effective collaboration, parallel design progress, and issue management among BIM developers from multiple domains. Smart contract logic for facilitating dynamic dependency logic for coordinating linked multi-domain submission over the project timeline is presented. A method to ensure that issues are completely, and timely addressed, and related parties are held accountable for their actions or non-response is presented by integrating a BIM change identifier and blockchain in typical issue management workflows. The method considers collaborative design and issue management workflows for the secure, efficient, and complete design of BIM models. The method is validated using an ongoing large construction project in Hong Kong
            URI
            https://doab-dev.siscern.org/handle/20.500.12854/193859
            Keywords
            Version Management; Issue Management; Security; Blockchain; thema EDItEUR::U Computing and Information Technology
            DOI
            10.36253/979-12-215-0289-3.32
            ISBN
            9791221502893
            Publisher
            Firenze University Press
            Publisher website
            www.fupress.com/
            Publication date and place
            Florence, 2023
            Series
            Proceedings e report,
            Pages
            8
            • OAPEN harvesting collection

            Browse

            All of DOABSubjectsPublishersLanguagesCollections

            My Account

            LoginRegister

            Export

            Repository metadata
            Doabooks

            • For Researchers
            • For Librarians
            • For Publishers
            • Our Supporters
            • Resources
            • DOAB

            Newsletter


            • subscribe to our newsletter
            • view our news archive

            Follow us on

            • Twitter

            License

            • If not noted otherwise all contents are available under Attribution 4.0 International (CC BY 4.0)

            donate


            • Donate
              Support DOAB and the OAPEN Library

            Credits


            • logo Investir l'avenirInvestir l'avenir
            • logo MESRIMESRI
            • logo EUEuropean Union
              This project received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 871069.

            Directory of Open Access Books is a joint service of OAPEN, OpenEdition, CNRS and Aix-Marseille Université, provided by DOAB Foundation.

            Websites:

            DOAB
            www.doabooks.org

            OAPEN Home
            www.oapen.org

            OAPEN OA Books Toolkit
            www.oabooks-toolkit.org

            Export search results

            The export option will allow you to export the current search results of the entered query to a file. Differen formats are available for download. To export the items, click on the button corresponding with the preferred download format.

            A logged-in user can export up to 15000 items. If you're not logged in, you can export no more than 500 items.

            To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

            After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.